Coatingsspecified forthe plant you run.
Floors that take forklifts and spills, steel that faces salt air, parts that leave the line powder-coated. Our technical team surveys your site and writes the coating system for each area.
- Site survey
- Written specification
- Industrial-grade systems

Start from the surface
Pick what needs coating. Each system is built from Rainbow products, top coat first. The site survey sets the final specification.
LayersTop coat first
TopcoatOptionalPU Floor CoatingPolyurethane topcoat that handles thermal movement, impact and UV. Often specified over an epoxy body coat.
Body coatSelf-Levelling Epoxy Floor CoatingA seamless, chemical-resistant floor for production areas, workshops and warehouses. Forklift traffic, spills and dropped steel leave no mark.
PrimerEpoxy PrimerLocks the coating to the slab.Typical areas
- Production floors with forklift traffic
- Warehouses and loading bays
- Workshops where steel gets dropped
Checked on the survey
- Moisture in the slab
- Surface strength and cracks
- Oil and chemical contamination
Where our systems work

Manufacturing & RMG
Production halls, machine bases, workshops






From survey to sign-off
- 1BriefYou tell us the site, how each area is used and your deadline.
- 2Site surveyMoisture, surface strength, contamination and any old coating are checked area by area.
- 3SpecificationA written system for each area: preparation, products and number of coats.
- 4Trial areaWhere needed, a small area is coated first so you can approve the finish.
- 5Application supportOur technical team guides the applicator on site.
Request a technical visit
Tell us about the site. The more we know about traffic, chemicals and timing, the more useful the first visit is.
Hotline08007777777Questions
Which system does my floor need?
It depends on what moves on the floor, what gets spilled and the state of the slab. The systems above are typical starting points; the survey sets the final one.
Can you coat over an old floor coating?
Often, yes. The survey checks how well the old coating holds and whether it must be removed first.
What helps before the visit?
A floor plan or drawings, the rough area of each zone, what traffic and chemicals each zone sees, and your shutdown window.